Renovations

Bathroom Renovations in Gold Coast

We manage bathroom renovations from initial design through to the final fit-off, coordinating every plumbing element along the way. The result is a bathroom that works as well as it looks.

Years trading
15+
Call-out fee
$0
Emergency
24/7
Gold Coast plumbing

Renovations Built On Solid Plumbing

At LB Plumbing Group, we manage the plumbing side of bathroom renovations across Gold Coast, from relocating pipework and drainage through to fitting off taps, showers and toilets. We work alongside builders, tilers and designers to keep the renovation on schedule, and we're upfront about what's achievable within your existing plumbing layout before work starts.  For renovations that also touch the kitchen or laundry, our kitchen renovations service can be coordinated at the same time. Every renovation starts with a free quote. Call 0432 116 606 to talk through your bathroom renovation.

Call Now
Stripped-back bathroom during renovation with exposed wall framing and rough-in plumbing
Completed bathroom renovation with freestanding bath, walk-in shower and timber vanity
BeforeAfter

Drag to compare — old unit vs new install

What we do

What's Included

Bathroom renovation plumbing covers everything below the surface, completed before tiling and finishing touches go in.

  • Layout changes

    We relocate pipework and drainage to support a new bathroom layout, including moving toilets, showers and vanities. Changes are planned around your renovation design from the outset.

  • Waterproofing coordination

    We work with waterproofers and tilers to make sure plumbing penetrations are sealed correctly. This helps prevent leaks and water damage once the bathroom is finished.

  • Fixture fit-off

    We install and connect taps, showers, toilets and vanities to complete the renovation. Every fitting is tested for leaks before we sign off on the job.

  • Drainage upgrades

    Older drainage is upgraded where needed to suit a new layout or improve water flow. This is usually addressed early, before tiling begins.

Common questions

FAQs

How much of a bathroom renovation involves plumbing work?
Plumbing is usually one of the first trades on site and one of the last, covering rough-in work early on and fixture connections at the end. The scope depends on whether the layout is changing or fixtures are simply being replaced.
Does a bathroom layout change always require new pipework?
Moving a toilet, shower or vanity to a new position generally requires relocating the supply and drainage pipework to match. Keeping fixtures in their existing positions usually keeps plumbing work to a minimum.
How long does the plumbing stage of a bathroom renovation take?
The rough-in stage typically takes a few days, with a further day or two needed for fixture fit-off once tiling and waterproofing are complete. Timing depends on the scope of the renovation and coordination with other trades.
Book a plumber

Bathroom Renovations — book today

Send through the details and we’ll come back with a free quote — $0 call-out fee on every job, right across the Gold Coast.

Start Your Bathroom Renovation

Optional — attach a photo of the issue (JPG or PNG, max 2 MB).

* Required fields

Protected by reCAPTCHA. Privacy · Terms

What locals say

Google Reviews

Call 0432 116 606